Skip links
Home Events BIM 3D/4D/5D/6D Construction Management Training l Register Now and become a BIM CM Professional
BIM Management Course

BIM 3D/4D/5D/6D Construction Management Training l Register Now and become a BIM CM Professional

BIM Management course

Bexel Management brings the next generation of digital construction management combining knowledge, experience, and creativity with massive computing power. It enables construction professionals a single source of information and digitalizes key workflows and advanced integrated and flexible systems, improving and streamlining workflow, efficiency, and productivity, and financial return.

Benefits Of BIM for Construction Management

 1. Validates The Constructability Of A Design

3D models, the core component of BIM, offer advantages for the construction phase especially if the building design or the site conditions are complex. Being able to see the end product visually makes it easier to decide what is the best way to construct the project. It can also help identify if there are any potential clashes between components, phases, trades, or even site features before the project begins construction.

2. Improves Construction Cost Estimates

With BIM, the 3D model of the project contains all the project information, including materials, products, and performance specifications. There’s no need for contractors to undertake a separate, lengthy take-off exercise in order to calculate the quantities – this is done by simply generating a quantity report. With the quantities and specification information derived directly from the model, creating a cost estimate for project tendering is much easier, quicker, and more accurate compared to using 2D drawings. Using BIM software with openBIM data exchange interfaces also makes exporting information into tendering or estimating programs easy and reliable.

3. Informs Construction Sequencing And Scheduling

Another key benefit of BIM for construction management is that advanced 3D modeling software allows the construction phase to be planned and simulated virtually. This can help determine the optimum construction sequence for complex projects and allows different options to be trialed before the work begins. It is also useful for calculating how long each construction activity will take, enabling a precise construction schedule to be created. BIM provides a perfect basis for a LEAN construction process.

4. Supports Prefabrication And Off-Site Construction

Prefabrication and modular construction are increasingly being used on projects to shorten the construction duration, reduce material wastage and costs, improve quality, and control labor costs. Having a higher degree of detail earlier in the design phase means that prefabricating sections of the project become more viable. The BIM model can be used to create shop drawings for prefabrication and is increasingly used as an information source in automated manufacturing processes that use digital machines.

5. Enhances The Completion And Handover Process

Rather than relying on updating as-built drawings, using BIM for construction management instead allows contractors to maintain an accurate, real-time record of the construction phase. By updating the information in the BIM model as the work progresses, the building information is centralized and easily accessible for facilities management staff. The model can also be used during the asset’s complete life cycle: for its ongoing operation and maintenance, as well as any future refurbishments or demolition work. For contracts with a building operation element, this can be a significant time-saver.

Who should Attend BIM Management course :

Bexel manager solution based on integrated 3D/4D/5D/6D Building Information Modeling software. Providing a single source of information over the complete lifecycle of the project. Resulting in increased productivity, profitability, change management, and what-if scenario.

BIM Manager offers next-generation digital construction management, for decision-makers, contracts managers, project managers, construction managers, design managers and engineers, quantity surveyors, planners, and cost controllers.

The course is designed for all project professionals to get in-depth knowledge, combining both industry practice, application, and hands-on practice in a short time.

Course Duration: 24 Hours 

Course Fee >> QAR.2000/= as Promotional Fee

Contact our respective Branch Consultants for Registration >> Qatar : +974 6646 4941 | Chennai : +91 84289 50588 | Mumbai : +91 98 19 379702 | Kuwait : +965 6077 4066 | Email : info@greenintl.net / training@greenintl.net

Course Fee Includes:

  • 24 Hours of Exam Preparation Training
  • Handouts / Study Materials
  • Course completion Certificate with 24 PDU
  • Hands-on learning from Industry Expert

We are happy to update the Training Schedule for October 2021

BIM 3D,4D,5D,6D Construction Management

17/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 24Hrs

UPDA Electrical

18/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 30 Hrs

UPDA Mechanical

18/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 30 Hrs

PMP

19/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 45 Hrs

BIM 3D,4D,5D,6D Construction Management

17/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 24Hrs

UPDA Civil

19/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

UPDA Mechanical

18/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 30 Hrs

UPDA – Chemical

20/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 24 Hrs

UPDA Architecture

20/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 21 Hrs

Qatar Civil Defence (QCDD) Exam Preparation- Mechanical

23/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 15 Hrs

Qatar Civil Defence (QCDD) Exam Preparation- Electrical

24/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 15 Hrs

Qatar Civil Defence (QCDD) Exam Preparation- Architecture

03/11/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 15 Hrs

LEED Green Associate (LEED GA)

19/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

Revit Architecture

19/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

Revit MEP

22/10/2021, Fridays Only, 2.00pm-7.00pm for 30 Hrs

CCP

24/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

Primavera (P6)

19/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

Electrical Installation, Inspection, and Testing

25/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 30 Hrs

Construction Site Management and Supervision – Advanced Techniques

26/10/2021, Sun-Tue-Thu, 7.00 pm-10.00 pm for 30 Hrs

Building Design Review

27/10/2021, Sat-Mon-Wed, 7.00 pm-10.00 pm for 30 Hrs

For more information and Course Outline of the BIM Management course : 

Contact our Consultants for One-Stop Professional service

Mob/WhatsApp:

+974 3340 3359/ +974 3110 0686/+974 6646 4941

Tel: +974 4476 0135 / +974 4476 0546

Email: info@greenintl.net / training@greeenintl.net

Facebook Group: https://www.facebook.com/groups/updammupexampm

Date

19 Oct 2021

Time

7:00 pm - 10:00 pm

Cost

QAR 2000 Promotional Fee

Labels

BIM MANAGEMENT

Location

Green International, Al Muntazah, Doha, Qatar
Al Muntazha, IBN Seena Street, Papa John’s Building, Mezz. Floor, Office No:3, Doha, Qatar

Location 2

Green International, Chennai
Aarthi Chambers, 2nd Floor Office Suite No: 4, 189, Anna Salai / Mount Road, Chennai – 600006

Location 3

Green International, Salmiya, Kuwait
Block No. 12, Abu Thar Al-Ghafari Street, Building # 16, Phase 2, 1st Floor, Salmiya Tel No: +965 2566 4532
Green International, Qatar

Organizer

Green International, Qatar
Phone
+974 4476 0135
Email
training@greenintl.net
Website
https://greenmtc-intl.com/
REGISTER
QR Code

Leave a comment